Skip to content

Scheduled Tests

Scheduled Tests #109

Triggered via schedule July 24, 2026 18:10
Status Failure
Total duration 10m 15s
Artifacts –

test-pytest-slow.yaml

on: schedule
Matrix: pytest
Fit to window
Zoom out
Zoom in

Annotations

3 errors
pytest (3.14)
Process completed with exit code 1.
pytest (3.10)
The strategy configuration was canceled because "pytest._3_14" failed
pytest (3.10)
The operation was canceled.