61 changes: 61 additions & 0 deletions wpwe/WPWE-ACTIONX-TYPE-CONVERSION.DATA
Original file line number Diff line number Diff line change
@@ -0,0 +1,61 @@
-- This reservoir simulation deck is made available under the Open Database
-- License: http://opendatacommons.org/licenses/odbl/1.0/. Any rights in
-- individual contents of the database are licensed under the Database Contents
-- License: http://opendatacommons.org/licenses/dbcl/1.0/

-- Copyright (C) 2026 Equinor

-- Convert B-1H to injection mid-run and back again, each time in the middle
-- of a monthly report interval. WPWE6 must accompany the first injecting
-- timestep and WPWE5 the return to production, neither of them deferred to
-- the report boundary that follows.

INCLUDE
'include/wpwe-model.inc' /

SUMMARY
INCLUDE
'include/wpwe-summary.inc' /

SCHEDULE
TUNING
2.0 3.0 1.0e-4 /
/
/

INCLUDE
'include/wpwe-wells.inc' /

ACTIONX
'TOINJ' 1 /
YEAR = 2020 AND /
MNTH = FEB AND /
DAY >= 15 /
/
WCONINJE
'B-1H' 'WATER' 'OPEN' 'RATE' 100.0 1* 400.0 /
/
ENDACTIO

ACTIONX
'TOPROD' 1 /
YEAR = 2020 AND /
MNTH = APR AND /
DAY >= 25 /
/
WCONPROD
'B-1H' 'OPEN' 'ORAT' 1500.0 4* 100.0 /
/
ENDACTIO

DATES
01 'FEB' 2020 /
01 'MAR' 2020 /
01 'APR' 2020 /
01 'MAY' 2020 /
01 'JUN' 2020 /
01 'JUL' 2020 /
01 'AUG' 2020 /
30 'AUG' 2020 /
/
END
51 changes: 51 additions & 0 deletions wpwe/WPWE-COMPLUMP-CONNECTION-COUNT.DATA
Original file line number Diff line number Diff line change
@@ -0,0 +1,51 @@
-- This reservoir simulation deck is made available under the Open Database
-- License: http://opendatacommons.org/licenses/odbl/1.0/. Any rights in
-- individual contents of the database are licensed under the Database Contents
-- License: http://opendatacommons.org/licenses/dbcl/1.0/

-- Copyright (C) 2026 Equinor

-- Are WPWE1 and WPWE2 counts of connections or of completions? The manual
-- says "the number of connections", but the workover that closes them acts on
-- a completion, and COMPLUMP lets one completion span several connections.
-- They count connections, while WPWE3 works on the distinct completions: at
-- day 13.1 B-1H reports WPWE2 = 2 together with WPWE3 = 1.
--
-- B-1H COMPLUMP lumps its four connections into two completions. A CON
-- workover closes completion 2, i.e. two connections at once:
-- WPWE2 = 2 counts connections, while WPWE3 = 1 shows that the
-- closed-to-bottom test treats them as one completion.
-- C-1H no COMPLUMP, one connection closed -> WPWE2 = 1 either way, so the
-- well shows the workover fired at all.

INCLUDE
'include/wpwe-model.inc' /

SUMMARY
INCLUDE
'include/wpwe-summary.inc' /

SCHEDULE
TUNING
2.0 3.0 1.0e-4 /
/
/

INCLUDE
'include/wpwe-wells.inc' /

COMPLUMP
--WELL I J K1 K2 N
'B-1H' 15 3 1 2 1 /
'B-1H' 15 3 3 4 2 /
/

CECON
'B-1H' 2* 3 4 0.6 2* 'CON' /
'C-1H' 2* 5 5 0.6 2* 'CON' /
/

DATES
27 'JAN' 2020 /
/
END
40 changes: 40 additions & 0 deletions wpwe/WPWE-CON-PLUSCON.DATA
Original file line number Diff line number Diff line change
@@ -0,0 +1,40 @@
-- This reservoir simulation deck is made available under the Open Database
-- License: http://opendatacommons.org/licenses/odbl/1.0/. Any rights in
-- individual contents of the database are licensed under the Database Contents
-- License: http://opendatacommons.org/licenses/dbcl/1.0/

-- Copyright (C) 2026 Equinor

-- A CON limit on completion 3 and an independent '+CON' limit on completion 4
-- of the same well. The '+CON' fires first, at day 7.1, the CON at day 19.1,
-- and both report WPWE2 = 1: the workover that closed the connection does not
-- change the count. Neither leaves the well on its topmost completion, so
-- WPWE3 stays silent. Each event is reported on its own timestep and reset on
-- the next.

INCLUDE
'include/wpwe-model.inc' /

SUMMARY
INCLUDE
'include/wpwe-summary.inc' /

SCHEDULE
TUNING
2.0 3.0 1.0e-4 /
/
/

INCLUDE
'include/wpwe-wells.inc' /

CECON
'B-1H' 2* 3 3 0.6 2* 'CON' /
'B-1H' 2* 4 4 0.6 2* '+CON' /
/

DATES
01 'FEB' 2020 /
08 'FEB' 2020 /
/
END
86 changes: 86 additions & 0 deletions wpwe/WPWE-DECK-CONNECTION-CHANGES.DATA
Original file line number Diff line number Diff line change
@@ -0,0 +1,86 @@
-- This reservoir simulation deck is made available under the Open Database
-- License: http://opendatacommons.org/licenses/odbl/1.0/. Any rights in
-- individual contents of the database are licensed under the Database Contents
-- License: http://opendatacommons.org/licenses/dbcl/1.0/

-- Copyright (C) 2026 Equinor

-- Do deck-driven connection changes count towards WPWE1 and WPWE2, and is
-- WPWE1 suppressed while the well is stopped? No CECON and no WTEST on the
-- probes, so every connection change below comes from WELOPEN alone.
--
-- B-1H open producer, one connection shut -> WPWE2 = 1 at day 34
-- B-2H open producer, one connection opened -> WPWE1 = 1 at day 34
-- B-3H stopped producer, same reopen -> silent
--
-- So they do count, and the manual's "if the well is not shut or stopped"
-- qualification on WPWE1 holds: B-2H against B-3H isolates that gate.
--
-- C-1H carries a CECON CON workover as an internal control, closing one
-- connection at a time on days 10.3, 34, 150 and 311, with WPWE3 on the last
-- of those. It is the only economic limit in the deck and touches no other
-- well, so the three probes above stay purely deck-driven.

INCLUDE
'include/wpwe-model.inc' /

SUMMARY
INCLUDE
'include/wpwe-summary.inc' /

SCHEDULE
TUNING
2.0 3.0 1.0e-4 /
/
/

INCLUDE
'include/wpwe-wells.inc' /

-- Part of the initial state: no timestep has elapsed, so these closures are
-- not themselves events under any reading.
WELOPEN
'B-2H' 'SHUT' 8 7 3 2* /
'B-3H' 'SHUT' 14 12 3 2* /
/

WCONPROD
'B-3H' 'STOP' 'ORAT' 1500.0 4* 100.0 /
/

CECON
'C-1H' 2* 1 5 0.6 2* 'CON' /
/

-- Produce for a month first, so the deck acts on flowing wells.
DATES
01 'FEB' 2020 /
/


WELOPEN
'B-1H' 'SHUT' 15 3 2 2* /
'B-2H' 'OPEN' 8 7 3 2* /
'B-3H' 'OPEN' 14 12 3 2* /
/

DATES
01 'MAR' 2020 /
01 'APR' 2020 /
01 'MAY' 2020 /
01 'JUN' 2020 /
01 'JUL' 2020 /
01 'AUG' 2020 /
01 'SEP' 2020 /
01 'OCT' 2020 /
01 'NOV' 2020 /
01 'DEC' 2020 /
01 'JAN' 2021 /
01 'FEB' 2021 /
01 'MAR' 2021 /
01 'APR' 2021 /
01 'MAY' 2021 /
01 'JUN' 2021 /
01 'JUL' 2021 /
/
END
69 changes: 69 additions & 0 deletions wpwe/WPWE-DECK-STATUS-CONVERSION.DATA
Original file line number Diff line number Diff line change
@@ -0,0 +1,69 @@
-- This reservoir simulation deck is made available under the Open Database
-- License: http://opendatacommons.org/licenses/odbl/1.0/. Any rights in
-- individual contents of the database are licensed under the Database Contents
-- License: http://opendatacommons.org/licenses/dbcl/1.0/

-- Copyright (C) 2026 Equinor

-- Does a deck-driven status change or type conversion count as a WPWE event?
-- No CECON, no WTEST: every status change below comes from the SCHEDULE
-- section alone, so any nonzero indicator is deck-driven.
--
-- B-1H WELOPEN SHUT -> silent
-- B-2H WCONPROD STOP -> silent
-- B-3H producer becomes injector -> WPWE6 = 1 at day 34
-- C-1H injector becomes producer -> WPWE5 = 1 at day 34
--
-- The asymmetry is real: a deck-driven status change is not an event, while a
-- type conversion is. WPWE4 and WPWE7 denote the simulator's own decisions,
-- and a conversion has no other source than the schedule or ACTIONX.

INCLUDE
'include/wpwe-model.inc' /

SUMMARY
INCLUDE
'include/wpwe-summary.inc' /

SCHEDULE
TUNING
2.0 3.0 1.0e-4 /
/
/

INCLUDE
'include/wpwe-wells.inc' /

-- C-1H starts on injection so that its change below is a genuine
-- injector to producer conversion.
WCONINJE
'C-1H' 'WATER' 'OPEN' 'RATE' 1000.0 1* 400.0 /
/

-- Produce for a month first, so the deck acts on flowing wells.
DATES
01 'FEB' 2020 /
/


WELOPEN
'B-1H' 'SHUT' /
/

WCONPROD
'B-2H' 'STOP' 'ORAT' 1500.0 4* 100.0 /
/

WCONINJE
'B-3H' 'WATER' 'OPEN' 'RATE' 1000.0 1* 400.0 /
/

WCONPROD
'C-1H' 'OPEN' 'ORAT' 1500.0 4* 100.0 /
/

DATES
01 'MAR' 2020 /
09 'MAR' 2020 /
/
END